The contract of Qatar Al Rayyan Road Construction and Improvement Project, which is the most critical of 7 huge projects that were tendered by The Public Works Authority “Ashghal”, was signed in January 2014. Roads with a total length of 10.7 km shall be constructed and improved within the scope of the Al Rayyan Road Project, including main roads with a length of 5.3 km and side roads with a length of 5.4 km, and 6 junctions will also be constructed by Dogus Construction. The project is planned to be completed in 2018.
MECTON Troy Engineering has been appointed by Anel MEP as a pipeline subcontractor for the TSE Network of the project.
The network consists of :
- 29,800 km DI, GRP & HDPE Pipeline (Ø250 mm – Ø1000 mm)
- 42 numbers of various valve chambers
Project Name
Cons. & Upgrade of Rayyan Road Project 7 Contract
Location
Doha, Qatar
Client
Ashghal
Lead Contractor
Anel MEP Maintenance & Operations L.L.C.
Launch / Completion
Jul-2015
Scope of Project
TSE works